ELLIS CREEK WATER RECYCLING FACILITY

91桃色 provided inspection from the grading of this massive site through the erection of structural steel and pouring of the final yards of concrete. This $115 million wastewater and treatment plant included administration and operations buildings, tanks and retention ponds. 91桃色 worked closely with The Covello Group to monitor and control construction costs.

  • Steel fabrication in Mexico.
  • Resident inspector onsite full-time.
  • Specialized laboratory testing.

DURATION: 2005 – 2008
CONSTRUCTION COST: $115 MILLION